Pilot completed
Wireless charging for road infrastructure vehicles
Wireless charging integrated on the electric vehicles that monitor and maintain road and highway infrastructure, taken from requirements to validation on a fleet vehicle.
- Client
- Movyon
- Industry
- Road and highway infrastructure
- Tested at
- Movyon Living Lab, Florence
- Vehicle
- Mercedes-Benz van from the Movyon fleet
- System
- 7.7 kVA · SAE J2954
- Programme
- MOST · NextGenerationEU

01Context
Movyon works on road and highway infrastructure, civil works and distributed assets across Italy, for highway concessionaires, public administrations and national infrastructure operators.
02Challenge
Vehicles that inspect and maintain the network have to be available whenever they are needed. Manual charging adds downtime and depends on someone remembering the cable, and it does not fit the autonomous vehicles the fleet is moving towards.
03Solution
- Operational vehicles
7.7 kVA SAE J2954 wireless charging integrated on vehicles used for infrastructure monitoring and maintenance.
- Autonomy-ready
The same system prepared for autonomous vehicle fleets, which cannot plug themselves in.
- Highway operations
Charging for electric vehicles dedicated to highway operations, built for high availability.
- End-to-end pilot
Functional and performance requirements, development and integration, then testing and validation on a vehicle from the company fleet.
04Results
- Wireless charging assessed in a real operating context, beyond lab tests.
- Results in line with the initial expectations.
- High operational availability and less downtime for highway service vehicles.
- Tested in the Living Lab at the Movyon site in Florence.
The pilot project allowed us to concretely assess the integration of wireless charging technology within a real-world context, moving beyond a purely theoretical or laboratory-based approach.
In collaboration with Zerowire, we followed the entire design process, starting from the definition of functional and performance requirements, through to system development and integration, and finally to testing and validation activities carried out directly on a vehicle from the company fleet.
The experimentation delivered results consistent with the initial expectations and provided valuable insights for a deeper understanding of the technology’s potential, its current limitations, and its possible future developments and applications.
From the pilot.
Ground pad in front of the pilot vehicle
Receiver pad mounted under the vehicle
Test in the Living Lab, Florence
The van parking over the ground pad in the Living Lab
Test and validation on the fleet vehicle
The pilot vehicle presented at a MOST event
Valerio Apicella (Movyon, centre) with the Zerowire team
With Movyon
Next project
A wireless charging dock for shared e-scootersRead the case
Similar challenge?
Tell us about your vehicles, robots or site. An engineer will get back to you.