Talk to an engineer

01 · E-Mobility & TransportationPark & charge · Grid-ready

Wireless charging for e-mobility and transportation

Park and charge. Zerowire pads sit flush in the floor of garages, depots and public parking and start charging as soon as the vehicle stops, while CORE and DATA keep every session in step with the grid.

Who it's for4 stakeholders

Where it pays off,
and for whom.

Wherever vehicles stop on a schedule, every stop can become charging time. Pick your role to see what changes for you.

Public transport, autonomous mobility and smart cities

Charging with no one in the loop

Buses, shuttles, robotaxis and car-sharing fleets top up at stops and depots on their own, which is essential when there is no driver to plug in. In smart cities charging disappears into the ground: kerbside bays, taxi ranks and smart parking along motorway rest areas. With nothing visible above the surface, sites are safer and need less maintenance.

  • Opportunity charging at every stop
  • SAE J2954 interoperable, built for 24/7 operation
  • Smart parking in rest areas, kerbside and taxi ranks

Typical sitesBus and shuttle depotsStops and terminalsMotorway rest areasKerbside and taxi ranks

Case study: A2A autonomous car sharing
Sharing and micromobility operators

Docks instead of vans

Shared e-scooters and e-bikes charge on sealed docks, from the grid and solar panels, instead of being collected and driven away to charge.

  • Fewer van trips and less CO2
  • No exposed contacts in the street
  • Several vehicles at once

Typical sitesMobility hubsStations and campusesCity centres

Case study: Bit Mobility scooter dock
Vehicle manufacturers (OEMs)

Wireless-ready from the factory

The biggest step forward for wireless charging is a vehicle that leaves the factory ready for it. We are open to working with vehicle makers to design the receiver pad and its electronics into the underbody, sized to the platform, the battery and the ground clearance, and interoperable with SAE J2954 ground pads.

  • Receiver designed into the platform, not added later
  • Co-development: simulation, prototype, validation
  • A differentiating feature for autonomous and premium models

Typical sitesCars and vansBuses and shuttlesAutonomous platforms

Fleet and logistics operators

Every vehicle ready for the next shift

Vans, service and delivery vehicles charge whenever they return to base, with no driver plugging in at the end of the day.

  • High availability, less downtime
  • Every return to base becomes charging time
  • No plugs or cables to wear out in the yard

Typical sitesDelivery depotsService and maintenance fleetsCompany car parks

Case study: Movyon road infrastructure vehicles

Go deeper.

Documents for engineers, fleet managers, utilities and investors.

Projects3 in this sector

Already on the road.

All projects

Pilot completed

Wireless charging for autonomous car sharing

A 7.7 kVA SAE J2954 wireless charging system for an autonomous car-sharing pilot, with foreign object detection and interoperability tests in a real urban setting.

E-Mobility

Pilot completed

Wireless charging for road infrastructure vehicles

Wireless charging integrated on the electric vehicles that monitor and maintain road and highway infrastructure, taken from requirements to validation on a fleet vehicle.

E-Mobility

Next stepFeasibility call

Start with
a feasibility call.

How we workFeasibility → Prototype → Integration → Support
Talk to an engineer